Projects
Thousands of kilometers of built and tested power lines and substations, of various voltage levels, around the world are references of the Energoinvest company. For years, Energoinvest teams have become recognizable for the implementation of projects for the construction of substations and transmission lines according to the “turnkey” system.
Download
catalog
The project included investment and technical documentation for the reconstruction of a multi-family residential building with 33 residential units - the net area of the building is 1,957.40 m2, floors P+2+M.
The goal of the technical inspection of the dam was to determine the static operation of the dam from the relevant indicators of monitoring the construction of the facility and the results of the inspection and subsequently determine the level of safety of individual structural parts and the dam facility
U okviru projekta je urađena procjena uticaja na okoliš (ESIA Study) izgradnje vjetroelektrane Vlašić uključuje 18 vjetroturbina snage 2,5 MW pojedinačno, pristupne ceste i odgovarajuću energetsku infrastrukturu, te će imati maksimalni proizvodni kapacitet od 45 MW.
References
Transport system for ash disposal in REK Oslomej (1×125 MW)
Reconstruction of the TENT B ash removal system
Rehabilitation of the mechanical and electrical equipment of the cooling towers of block 7 in the Kakanj thermal power plant
Reconstruction of the fly-ash silos in Thermal Power Plant Kakanj, Bosnia and Herzegovina
Rekonstrukcija sistema odlaganja pepela po sistemu ” ključ u ruke ” u TE ” Nikola Tesla B ” Obrenovac, Srbija
Klijent / Public Enterprise Elektroprivreda Serbia
Osoblje / N/A
Vrijednost / 16.000.000,00 EUR
Status / Završeno
Hidraulični sistemi za prenos letećeg i donjeg pepela po sistemu ” ključ u ruke ” u TE ” Oslomej ” Kičevo, Makedonija
Klijent / Public Enterprise ELEM
Osoblje / N/A
Vrijednost / 2.050.000,00 EUR
Status / Završeno
Reconstruction of the ESP and modernization of the system for transporting ash and deposited ash according to the “turnkey” system in TPP “Tuzla” block 6, Tuzla, Bosnia and Herzegovina
Development of a study of hydropower utilization of the Bioštica river (HP Kruševo – 10.7 and HP Zeleni vir – 2.35 MW)
Investment and technical documentation of preparatory works for the construction of HPP Vranduk 20MW