Projects

Thousands of kilometers of built and tested power lines and substations, of various voltage levels, around the world are references of the Energoinvest company. For years, Energoinvest teams have become recognizable for the implementation of projects for the construction of substations and transmission lines according to the “turnkey” system.

Download
catalog

Cilj projekta je da se izradom investiciono-tehničke dokumentacije utvrde tehnološki pouzdana tehnička rješenja odsumporavanja dimnih plinova bloka 5 i 6 u TE Tuzla.
Within the scope of the project, the services of design, procurement, delivery and installation of equipment were provided, as well as commissioning of the new ash removal system.

References

Transport system for ash disposal in REK Oslomej (1×125 MW)

Reconstruction of the TENT B ash removal system

Rehabilitation of the mechanical and electrical equipment of the cooling towers of block 7 in the Kakanj thermal power plant

Reconstruction of the fly-ash silos in Thermal Power Plant Kakanj, Bosnia and Herzegovina

Rekonstrukcija sistema odlaganja pepela po sistemu ” ključ u ruke ” u TE ” Nikola Tesla B ” Obrenovac, Srbija

Klijent / Public Enterprise Elektroprivreda Serbia
Osoblje / N/A
Vrijednost / 16.000.000,00 EUR
Status / Završeno

Hidraulični sistemi za prenos letećeg i donjeg pepela po sistemu ” ključ u ruke ” u TE ” Oslomej ” Kičevo, Makedonija

Klijent / Public Enterprise ELEM
Osoblje / N/A
Vrijednost / 2.050.000,00 EUR
Status / Završeno

Reconstruction of the ESP and modernization of the system for transporting ash and deposited ash according to the “turnkey” system in TPP “Tuzla” block 6, Tuzla, Bosnia and Herzegovina

Development of a study of hydropower utilization of the Bioštica river (HP Kruševo – 10.7 and HP Zeleni vir – 2.35 MW)

Investment and technical documentation of preparatory works for the construction of HPP Vranduk 20MW