As part of the project, the following services and works were executed and goods delivered:
- Basic, main and detailed design of the fla-ash silo with a volume of 3000 m3,
- Delivery of silo equipment
- Construction works of the new silo
- Installation of equipment (mechanical, electrical, equipment for automation, measurement and regulation, telephony and fire protection installations, equipment for software and hardware upgrades
- available for the pneumatic ash transport system of blocks 4, 5 and 6,
- Anti-corrosion protection of equipment and steel structures,
- Performing thermal insulation on installations,
- Functional testing, trial operation and commissioning
- The management system was implemented according to the turnkey system