Construction of a new gas boiler house with a steam production capacity of 3 x 50 t/h – Zenica Heating Plant

For the purposes of building a new gas boiler house with a steam production capacity of 3×50 t/h, the following services were performed:

  1. mechanical, civil and plumbing project of connecting pipelines between the new boiler house and current sources and future consumers (basic design, main project and detailed design)
  2. Nostrification of the foreign basic and main design of the gas boiler house (mechanical-technological, civil and architectural, electrical and automation)
  3. Revision of the main project of the gas boiler facility (mechanical-technological, civil and architectural, electrical and automation)